Rail Baltica Estonia Confirms €41.3M High-Speed Train Depot
Rail Baltic Estonia will build the €41.3M Soodevahe rolling stock depot by 2028, creating 200 jobs, enhancing safety, and centralizing high-speed train maintenance.

- Rail Baltic Estonia will construct a €41.3M high-speed rolling stock depot in Rae municipality, set for completion by December 2028.
- The facility will be the largest in the Baltics, with capacity to service six high-speed trains simultaneously and creating up to 200 jobs.
- The investment in centralized maintenance infrastructure is critical as the European high-speed rail sector faces intense scrutiny over safety following recent fatal incidents in Spain.
RAE, ESTONIA – Rail Baltic Estonia has confirmed plans to build a €41.3 million rolling stock depot in Rae municipality, with a targeted completion date of December 2028. The project, which will create 150-200 permanent jobs, aims to establish a central hub for all high-speed train maintenance and repair. This investment in operational reliability comes as the European rail industry grapples with safety concerns following a deadly high-speed train collision in Spain earlier this week.
| Category | Specification / Detail |
|---|---|
| Project / Model | Soodevahe Rolling Stock Depot |
| Value / Budget | €41,331,818 (excluding VAT) |
| Key Stakeholders | Rail Baltic Estonia (Client), Elron (Operator), OÜ Reaalprojekt & NORD PROJEKT AS (Design) |
| Timeline | Construction Start: End of 2026; Completion: December 2028 |
| Capacity | Simultaneous service for 6 high-speed or 12 regional trains |
| Jobs Created | 150–200 permanent, highly qualified positions |
Operational & Technical Details
The Soodevahe depot is designed to centralize the entire train lifecycle. Its main building houses a maintenance hall and a three-storey administrative block. Inside, six maintenance tracks provide a total length of 1,380 metres. These tracks can accommodate both high-speed and regional train sets. A separate track is dedicated for a train wash and wheel lathe. The outdoor area includes six additional service tracks for cleaning and parking. This configuration ensures the facility’s external capacity matches its internal throughput.
Market Impact Analysis
This depot is a foundational asset for the operational viability of the entire Rail Baltica network. By centralizing maintenance, Rail Baltic Estonia aims to maximize fleet availability and reliability from day one. The recent fatal derailments in Spain, on a well-established network, underscore that modern rolling stock alone is insufficient for ensuring safety. Robust, integrated maintenance infrastructure is non-negotiable. The Soodevahe facility positions Rail Baltica to proactively manage asset health, mitigating risks and building public trust in a region new to high-speed rail. It also establishes a critical center of technical expertise for the Baltic states.
FAQ: Quick Facts
What is the main value of this contract?
The contract for the depot’s design and construction is valued at €41,331,818, excluding VAT.
When is the expected completion date?
The facility is scheduled to be completed by the end of December 2028.


