CPK Launches 200 km/h AeroExpress Trains Tender Poland

Poland’s CPK launched a tender for 200 km/h AeroExpress trains connecting Warsaw and Łódź via its future airport.

CPK Launches 200 km/h AeroExpress Trains Tender Poland
May 25, 2026 1:58 am | Last Update: May 25, 2026 1:59 am
A+
A-
⚡ In Brief: Poland’s Centralny Port Komunikacyjny will launch a tender in late 2024 for 200 km/h AeroExpress trains to connect Warsaw and Łódź via the new central airport, targeting 30,000 daily passengers by 2035.

WARSAW, POLAND – Centralny Port Komunikacyjny (CPK), the state-owned enterprise responsible for Poland’s major infrastructure integration, has announced it will launch a procurement tender in late 2024 for conventional AeroExpress (AEX) rolling stock capable of speeds up to 200 km/h. This new fleet will serve the high-density corridor linking Warsaw, the future central airport, and Łódź, carrying an estimated 30,000 passengers daily by 2035. The decision to utilize conventional 200 km/h trainsets instead of very high-speed rolling stock is designed to control upfront capital costs while maintaining high-frequency service.

What Does This Contract Cover?

The upcoming tender covers the acquisition of conventional electric multiple units (EMUs) capable of operating at speeds up to 200 km/h (125 mph) to serve as the regional backbone of the Warsaw–Łódź corridor. The newly established rolling stock company under CPK will manage the procurement and subsequent deployment of the fleet. Individual trainsets are specified to carry between 400 and 600 passengers, accommodating a blended flow of daily commuters, airport employees, and air travelers. Scheduled service patterns will establish 15-minute headways on the Warsaw East–Airport section, with services extending to Łódź Kaliska every 30 minutes. To optimize existing path capacity, these regional AEX services will operate through the conventional rail tunnel managed by PKP PLK, leaving the newly planned high-speed rail tunnel dedicated exclusively to long-distance trains running at speeds up to 350 km/h.

Key Contract Data

ParameterValue
Contract NameAeroExpress (AEX) Rolling Stock Procurement
Total ValueNot disclosed
Parties InvolvedCentralny Port Komunikacyjny (CPK), PKP PLK (infrastructure partner)
Timeline / CompletionTender launch scheduled for late 2024; operational ramp-up targeted by 2035
Country / CorridorPoland / Warsaw East – CPK Airport – Łódź Kaliska

How Does This Compare to Similar Contracts?

By electing to procure 200 km/h (125 mph) conventional regional express rolling stock instead of full high-speed trainsets for the airport feeder route, Poland is adopting a cost-containment strategy mirrored by cash-constrained transit agencies globally. In the United States, Amtrak is introducing its “Airo” trainsets designed for a maximum speed of 125 mph (200 km/h) to modernize regional corridors, including the Northeast Corridor which recently received $10.4 billion under a proposed $580 billion federal surface transportation bill (Source: Axios, 2026; U.S. House Committee, 2024). This contrast highlights a global trend where operators prioritize 125 mph conventional regional assets over cost-prohibitive 220+ mph high-speed rolling stock. For instance, California’s High-Speed Rail project continues to face high-speed funding volatility, relying on an unstable $1 billion annual cap-and-invest allocation while federal funding remains restricted by legislative blocks (Source: San Francisco Chronicle, 2024).

Editor’s Analysis

CPK’s choice to split its rolling stock strategy between 200 km/h AeroExpress services and 350 km/h long-distance services represents a highly pragmatic approach to capital allocation. By routing the AEX trains through PKP PLK’s conventional tunnel, the operator avoids bottlenecking the high-speed network while capturing high-density commuter and airport staff traffic. This hybrid model reflects a broader international shift toward optimizing existing infrastructure corridors rather than relying solely on high-cost greenfield megaprojects (Source: Construction Dive, 2024).

FAQ

Q: What is the maximum operating speed of the AeroExpress trains?
A: The AeroExpress trains will have a maximum operating speed of 200 km/h (125 mph). This allows them to run efficiently on conventional tracks while maintaining competitive travel times.

Q: How frequently will the new AeroExpress service run?
A: Trains will run every 15 minutes on the section between Warsaw East and the new CPK airport. The service will extend to Łódź Kaliska every 30 minutes.

Q: What is the estimated project cost and budget for this rolling stock tender?
A: The exact financial budget and contract value for the rolling stock procurement have not been officially disclosed by CPK.

Railwaynews.net is a railway information and news platform. Website presents from all around the world railway sector news, developments, projects and tender for the sector specialists. Railwaynews supports to industry events and announced them for potential participants. Railwaynews plans to collecting data from all around the world, about railway infrastructure, rolling stock, railway transportation datum, geographical datum to present for railway professionals for short term. Railwaynews will build new platforms aims to high value railway business environment for all railway specialists, railway fans and especially railway suppliers and their decision makers. Railwaynews presents whole information from rail professionals to rail professionals.