Last Updated: 2026-11-26
The Mumbai Metro system serves as a vital transit network for the city, currently featuring 105 stations. As of November 26, 2026, passengers can utilize five operational lines, while an additional corridor is actively under construction to expand connectivity.
5
105
MMRDA, Mumbai Metro Rail Corporation Ltd., MMMOCL

🔍 Click to enlarge
Understanding the Mumbai Metro Map
The network is structured around distinct corridors that link key residential and commercial areas. Line 1 connects Versova to Ghatkopar, while Line 2 facilitates travel between Andheri (West) and Anand Nagar. Line 3, managed by Mumbai Metro Rail Corporation Ltd. provides a significant route from Aarey JVLR to Cuffe Parade. Furthermore, Line 7 and Line 9 offer connections through the northern sectors, with Line 4 currently being developed to link Gaimukh Station and Wadala TT Station.
Mumbai Operational Transit Lines
| Code | Route (A ↔ B) | Mode | Status | Stations | Operator |
|---|---|---|---|---|---|
| 1 | Versova ↔ Ghatkopar | Subway | Operational | 12 | MMRDA |
| 2 | Andheri (West) ↔ Anand Nagar | Subway | Operational | 17 | MMRDA |
| 3 | Aarey JVLR ↔ Cuffe Parade | Subway | Operational | 27 | Mumbai Metro Rail Corporation Ltd. |
| 7 | Dahisar (East) [Line 9] ↔ Gundavali | Subway | Operational | 14 | MMRDA |
| 9 | Kashigaon ↔ Dahisar (East) [Line 9] | Subway | Operational | 4 | MMRDA |
Mumbai Under Construction & Planned Lines
| Code | Route (A ↔ B) | Mode | Status | Stations | Operator |
|---|---|---|---|---|---|
| 4 | Gaimukh Station ↔ Wadala TT Station | Subway | Under Construction | 33 | MMMOCL |
💡 Did You Know?
- The Mumbai Metro network currently includes 105 unique stations across its operational lines.
- Line 3 is the longest operational route in the system, featuring 27 stops.
Key Stations & Transfer Nodes
Serves Line 2, Line 7, and Line 9.
Acts as a primary junction for the northern network.
Line 1.
Serves as the western terminal for Line 1.
Line 1.
Functions as the eastern terminal for Line 1.
Line 2.
The western starting point for Line 2.
Line 3.
The northern terminal for the extensive Line 3.
Line 3.
The southern terminus for Line 3.
Frequently Asked Questions
How many lines are currently operational in Mumbai?
As of November 2026, there are 5 operational metro lines.
Which station serves as a major hub for Line 2, 7, and 9?
Dahisar (East) [Line 9] is the station where these three lines intersect.







