Dubai RTA Launches 55-km Airport Express Rail Link Design

Dubai RTA launched design work for a 55-km rail line linking Dubai International and Al Maktoum airports, reviewing bids from six consortia for five stations.

Dubai RTA Launches 55-km Airport Express Rail Link Design
September 26, 2026 9:13 am | Last Update: September 26, 2026 9:14 am
A+
A-
⚡ In Brief: Dubai’s Roads and Transport Authority has evaluated bids from six international engineering consortia to design a 55-kilometre rail corridor connecting Dubai International and Al Maktoum International airports.

DUBAI, UAE – Dubai’s Roads and Transport Authority received bids from six global engineering consortia on 8 July 2026 for the feasibility and preliminary engineering design of a 55-kilometre airport rail link. The route will connect Dubai International Airport directly to Al Maktoum International Airport across five core stations and two operational branch alignments. Final capital expenditure budgets and construction timelines have not been publicly disclosed.

What Is the Full Scope of This Project?

The proposed rail corridor encompasses 55 route kilometres connecting Al Garhoud to Al Maktoum International Airport, supplemented by branch alignments serving Business Bay and Emirates Golf Club. Originating at the existing Dubai Metro Red Line terminus at Dubai International Airport (DXB), the track alignment proceeds through Al Jaddaf, parallels Al Khail Road, and passes through Jumeirah Village Circle (JVC) before terminating at Al Maktoum International Airport (DWC). JVC will serve as an interchange station with the planned Dubai Metro Gold Line, facilitating passenger transfers across east-west routes. Station infrastructure specifications include provisions for off-airport check-in counters, remote baggage handling systems, and passenger security screening checkpoints. Six pre-qualified engineering groups submitted proposals for the study phase: AECOM–Surbana Jurong, AtkinsRéalis, Jacobs, Parsons–Arup, Systra–Egis, and WSP.

Key Project Data

ParameterValue
Project / Contract NameDXB–DWC Fast Rail Link (Airport Express Line) Study and Design
Total ValueNot disclosed
Parties InvolvedDubai Roads and Transport Authority (RTA), AECOM–Surbana Jurong, AtkinsRéalis, Jacobs, Parsons–Arup, Systra–Egis, WSP
Timeline / CompletionNot disclosed
Country / CorridorUnited Arab Emirates / Dubai International Airport to Al Maktoum International Airport

How Does This Compare to Similar Projects?

Global airport connectivity investments are expanding alongside rising patronage, with rail passenger volumes across UIC member operators climbing 7% between 2023 and 2025 (Source: International Union of Railways, 2025). The 55-kilometre alignment directly interfaces with Dubai’s AED 128 billion ($35 billion) master plan to scale DWC’s capacity to 260 million annual passengers across five parallel runways. Comparable high-density Asian transit projects demonstrate parallel capital commitments to automated high-capacity rail, including Alstom’s supply of metro trainsets and CBTC signalling for Mumbai Metro Line 4 and Hitachi Rail’s delivery of signalling and SCADA systems for Taipei’s Keelung metropolitan line (Source: Hitachi Rail, 2025). In contrast, public capital allocation for urban passenger rail in North America contracted significantly, with United States state and local spending falling to $7 billion in 2025 (Source: Urban Institute, 2025).

Editor’s Analysis

The 55-kilometre airport link establishes the transit spine required to transfer passenger volumes as Dubai shifts primary airline operations from DXB to Al Maktoum International over the next decade. Integrating airline check-in and baggage drops into urban stations like JVC converts intermediate stations into decentralized airport concourses, reducing curb congestion at the main terminals. This strategy matches broader international demand patterns, with urban and regional rail system procurement across key Asian and Middle Eastern corridors driving equipment markets toward a projected 4.7% compound annual growth rate through 2036 (Source: Future Market Insights, 2026).

FAQ

Q: Which engineering consortia are competing for the Dubai airport rail contract?
A: Six international joint ventures submitted proposals: AECOM–Surbana Jurong, AtkinsRéalis, Jacobs, Parsons–Arup, Systra–Egis, and WSP. Dubai’s Roads and Transport Authority is evaluating the technical and commercial submissions.

Q: What is the total construction cost and completion date for the rail link?
A: The Roads and Transport Authority has not announced the capital value or construction schedule for the line. The project remains in the engineering study and alignment design phase.

Q: How will the airport line connect with the existing Dubai Metro network?
A: The alignment connects directly to the Dubai Metro Red Line at Dubai International Airport in Al Garhoud and creates an interchange with the planned Gold Line at Jumeirah Village Circle. Two branch alignments will also provide direct connections toward Business Bay and Emirates Golf Club.

Railway infrastructure, rolling stock and transport technologies specialist focused on global rail industry developments, high-speed rail systems, signaling technologies and freight transportation. Covering railway investments, public transport modernization, rail operations and international mobility projects across Europe, Asia and North America.