Georgia Ports Authority Invests $5B in Intermodal Rail
Georgia Ports Authority confirmed a $5 billion plan in Brunswick and Savannah to expand auto rail links for 42 weekly trains run by CSX and Norfolk Southern.

BRUNSWICK, United States – The Georgia Ports Authority (GPA) outlined a nearly $5 billion infrastructure program on November 10 to support automotive logistics across its Brunswick and Savannah maritime terminals. The authority confirmed Brunswick achieved 277% volume growth over the past decade, handling 50 vessels across three existing roll-on/roll-off berths during October alone. The terminal expansion directly serves regional manufacturing operations for Audi, Hyundai Motor Group, Kia, and Rivian.
What Is the Full Scope of This Project?
The Georgia Ports Authority infrastructure program encompasses a ten-year, $5 billion capital strategy covering roll-on/roll-off berth construction in Brunswick and rail intermodal integration at Savannah’s Mason Mega Rail facility. A fourth roll-on/roll-off vessel berth is currently under construction in Brunswick; civil engineering work stands at 60% completion with commissioning scheduled for December 2027 (Source: Georgia Ports Authority, 2026). Upstream automotive component handling relies on the Port of Savannah, where 40 weekly container ship calls feed 42 double-stack intermodal rail departures per week operated by Class I carriers Norfolk Southern Railway and CSX.
Specific project cost breakdowns between individual maritime berth packages and inland rail assets were not disclosed by port officials at the time of publication.
Key Project Data
| Parameter | Value |
|---|---|
| Project / Contract Name | Georgia Ports Automotive and Intermodal Expansion Program |
| Total Value | Nearly $5 billion USD (ten-year capital plan) |
| Parties Involved | Georgia Ports Authority (GPA), Norfolk Southern Railway, CSX |
| Timeline / Completion | Berth 4 completion December 2027; program execution over 10 years |
| Country / Corridor | United States / Southeast Intermodal Freight Corridor |
How Does This Compare to Similar Projects?
Comparable data for this specific rail-connected automotive terminal program was not publicly available at time of publication.
Note: Independent verification of capital expenditure allocations across competing US Atlantic automotive roll-on/roll-off terminals was not available at time of publication.
Editor’s Analysis
GPA’s coordinated development of finished-vehicle berths at Brunswick alongside intermodal part logistics at Savannah’s Mason Mega Rail positions the authority as a primary logistics anchor for the growing Southeastern US automotive manufacturing cluster. By securing direct Class I rail interchanges with both CSX and Norfolk Southern, the port authority shields original equipment manufacturers from inland supply chain bottlenecks (Source: Progressive Railroading, 2026). This terminal model indicates that future vehicle logistics hubs will prioritize integrated multi-port ecosystems over isolated marine facilities.
FAQ
Q: When will the new roll-on/roll-off berth at the Port of Brunswick open?
A: The fourth berth is 60% complete and is scheduled to open in December 2027 under the management of the Georgia Ports Authority.
Q: How much rail traffic does the Port of Savannah handle for automotive logistics?
A: Savannah operates 42 double-stack container trains every week from its Mason Mega Rail terminal, connecting to inland markets via Norfolk Southern and CSX.
Q: Which vehicle manufacturers utilize the Georgia ports network?
A: The facilities support finished vehicle shipments and components for Audi, Hyundai Motor Group, Kia, Rivian, BMW, Mercedes-Benz, and Volvo.






