Singapore Downtown Line Stage 2 Project: MRT Expansion, Rochor to Petir
Singapore’s Downtown Line Stage 2 (DTL2) railway project, completed in 2015, enhanced connectivity, boosting Northwest Singapore’s accessibility.

Downtown Line Stage 2 (DTL2) – Railway Technology
This article explores the Downtown Line Stage 2 (DTL2) project in Singapore, a significant undertaking in expanding the country’s mass rapid transit (MRT) network. The project’s aim was to enhance connectivity between the northwestern region of Singapore and the central business district (CBD), alleviating existing transport limitations and improving accessibility for residents of Bukit Panjang and Bukit Timah. This involved the construction of new stations, tunnels, a depot, and the integration of advanced railway technologies. The analysis will delve into the project’s engineering challenges, technological advancements implemented, contractual arrangements, and overall contribution to Singapore’s public transportation infrastructure. The project’s success is crucial for improving the quality of life for commuters and fostering economic growth in the region. The evaluation of the DTL2 project will highlight both the complexities and the remarkable achievements in urban rail development.
Route Alignment and Station Development
The DTL2, initially known as the Bukit Timah Line (BTL), extends from Rochor in the city center to Petir in the northwest, encompassing twelve stations. The route’s strategic planning aimed to connect underserved areas to key destinations such as Orchard Road, Clarke Quay, and the Marina Bay area. Each station’s name reflects the local history and heritage, enhancing passenger experience and memorability. Nine of the twelve stations were newly constructed, each involving individual design and build contracts. The careful consideration of station locations and names demonstrates a commitment to integrating the rail line seamlessly into the urban fabric.
Technological Advancements and Infrastructure
DTL2 showcases several significant technological advancements. The implementation of Automatic Train Operation (ATO) and Automatic Train Supervision (ATS) systems enhances efficiency and safety. Communication-Based Train Control (CBTC) and WESTRACE electronic interlocking, provided by Invensys Rail and Singapore Technologies Electronics, further optimize train control and safety. The use of platform screen doors (PSD) at all stations boosts passenger safety and enhances energy efficiency by optimizing tunnel ventilation. The adoption of space-saving lift technology, eliminating the need for machine rooms, exemplifies innovative design and efficient space utilization. The Gali Batu Depot, a crucial component, incorporates a main workshop, administration center, and locomotive workshop, showcasing comprehensive depot infrastructure. The depot extends from Kranji Expressway junction to Kwong Hou Sua Teochew Cemetery, along Woodlands Road.
Contractual Arrangements and Project Management
The DTL2 project involved numerous contracts awarded to various companies. These contracts covered a wide range of aspects, including signaling systems, rolling stock (Bombardier Movia cars), lifts (Otis Elevator Company), escalators (CNIM), track laying (Alstom), and station construction (multiple contractors including GS Engineering and Construction, Hock Seng Infrastructure, Lam Chang Building Contractors, and others). The Land Transport Authority (LTA) of Singapore effectively managed these contracts, ensuring timely completion and adherence to quality standards. The complexity of the project management demonstrates the effective coordination required to execute such a large-scale infrastructure project.
Project Costs and Timeline
The DTL2 project had an estimated cost of S$803 million (approximately US$644.5 million). Construction commenced in July 2009, with a targeted opening in 2015. The project was part of a larger three-stage Downtown Line development. A table summarizing key project details is provided below:
| Project Parameter | Value |
|---|---|
| Project Name | Downtown Line Stage 2 (DTL2) |
| Project Cost | S$803 million (approx. US$644.5 million) |
| Project Length | 16.6km (approximate) |
| Number of Stations | 12 (9 newly constructed) |
| Connection of Cities/Areas | Rochor to Petir; connects Northwest Singapore to CBD and Marina Bay |
| Start of Construction | July 2009 |
| Targeted Completion | 2015 |
Conclusions
The Downtown Line Stage 2 project stands as a testament to Singapore’s commitment to developing a world-class public transportation system. The successful completion of DTL2, within budget and timeframe, significantly enhanced connectivity in Singapore, easing congestion and improving accessibility for residents of the northwestern region. The project’s adoption of advanced railway technologies, such as ATO, ATS, and CBTC, demonstrates a forward-looking approach to infrastructure development. The meticulous project management, encompassing numerous contracts and diverse engineering challenges, showcases effective coordination and expertise in large-scale infrastructure projects. The careful integration of the rail line into the existing urban fabric, as evidenced by the thoughtful selection of station names and locations, highlights the project’s consideration for urban planning and passenger experience. The integration of the DTL2 with other MRT lines, notably the North-East Line (NEL), North-South Line (NSL), and Circle Line (CL), demonstrates a strategic approach to creating a comprehensive and efficient mass transit network. The DTL2 project’s success has set a benchmark for future rail development projects, not only in Singapore, but also globally, showcasing the feasibility and benefits of integrating innovative technologies within a robust urban transit system. The project served as a significant step in improving the lives of Singaporean commuters, providing efficient and convenient access to key areas of the city and beyond.
Company Information:
- Land Transport Authority (LTA): Singapore’s governing body for land transport.
- Invensys Rail: (Acquired by Schneider Electric) A provider of rail signaling and communication systems.
- Singapore Technologies Electronics: A technology and engineering company.
- Bombardier Transportation: A global manufacturer of rail vehicles.
- Otis Elevator Company: A global manufacturer and installer of elevators and escalators.
- Constructions Industrielles de la Mediterranee (CNIM): A French industrial group, with expertise in escalators and other infrastructure equipment.
- Alstom: A global leader in rail transport solutions.
- GS Engineering & Construction: A major South Korean construction company.
- Hock Seng Infrastructure: A Singaporean construction company.
- KTC Group: A Singaporean construction company specializing in earthworks.
- CPG Corporation: A Singaporean construction company.
- Lam Chang Building Contractors: A Singaporean construction company.
- Tiong Seng Holdings: A Singaporean construction company.
- SK E&C: A South Korean construction company.
- McConnell Dowell: An international construction company.
- Double Wong Foundation: A Singaporean foundation and piling specialist.
- Alpine BAU: An international construction company, with branches globally.
- Sembawang Engineers & Constructors: A Singaporean construction company.
- Shanghai Tunnel Engineering: A Chinese tunneling and construction company.
- SsangYong Engineering & Construction: A South Korean construction company.
- Mott MacDonald: A global engineering, management, and development consultancy.
- Meinhardt Group: A global engineering consultancy.