NTA Launches $10B Systems Tender for Tel Aviv Metro
NTA launched a $10 billion tender in Israel for the Tel Aviv Metro, seeking GoA4 driverless trains, signalling, and systems maintenance for its 109 stations.

TEL AVIV, ISRAEL – NTA Metropolitan Mass Transit System Ltd. opened the pre-qualification phase in March 2025 for USD 10 billion in operational systems and rolling stock packages for the Tel Aviv Metro. The procurement will select international consortia to supply driverless trains, signalling, and maintenance across 109 stations. The overall 150-kilometre underground network carries an estimated budget of USD 60 billion.
What Does This Contract Cover?
The Infra II procurement package allocates approximately USD 10 billion to supply fully automated GoA4 rolling stock, signalling systems, electrical infrastructure, and long-term maintenance. The driverless trains will autonomously execute all core functions, including acceleration, precision stopping, platform door operation, and depot movements. Signalling, telecommunications, and power networks will operate under a centralized command architecture that integrates with Israeli national critical-infrastructure cybersecurity standards. Operations and maintenance obligations form a core component of the tender alongside the rolling stock delivery, complementing the separate USD 25 billion Infra I civil works package covering tunnelling and underground station construction.
Key Contract Data
| Parameter | Value |
|---|---|
| Contract Name | Tel Aviv Metro Infra II (Systems, Rolling Stock, and O&M) |
| Total Value | USD 10 billion (Infra II); USD 60 billion (total network) |
| Parties Involved | NTA Metropolitan Mass Transit System Ltd., Ministry of Transport, Ministry of Finance, Metro Authority |
| Timeline / Completion | Not disclosed |
| Country / Corridor | Israel / Tel Aviv Metropolitan Area (Lines M1, M2, M3) |
How Does This Compare to Similar Contracts?
The USD 10 billion Infra II package represents one of the largest single systems integration and GoA4 rolling stock tenders globally, exceeding the scale of recent international mass-transit automated deployments. By comparison, modern driverless systems such as CAF’s OPTIO installation on Naples Metro Line 10 and CRRC’s deployments on Chengdu Metro Lines 13 and 30 were tendered as isolated line packages rather than a unified 150-kilometre three-line network (Source: Railway News, 2024). In North America, systems upgrades remain smaller in scope, such as Hitachi Rail’s C$100 million train control contract to modernize the San Francisco Municipal Transportation Agency’s light rail CBTC signalling (Source: Hitachi Rail, 2025). The operations and maintenance element of Infra II also surpasses major global maintenance contracts, such as Wabtec’s US$700 million service agreement for Guinea’s Trans-Guinean railway (Source: Rio Times, 2025). Independent verification of the exact train delivery delivery milestones for Tel Aviv was not available at time of publication.
Editor’s Analysis
Bundling rolling stock, GoA4 automation, and long-term maintenance into a single USD 10 billion systems package requires tier-one suppliers to absorb substantial integration risks across civil and digital interfaces. This project reflects an accelerating industry transition toward turnkey digital train control, supporting projections that the global connected rail sector will expand at a 5.8% compound annual growth rate to USD 196.1 billion by 2034 (Source: Market.us, 2024). European signalling suppliers, which lead the global market in software-based dispatching and modern SCADA platforms, will face direct competition from Asian rolling stock manufacturers seeking to expand high-capacity driverless metro references (Source: Rail Market, 2025).
FAQ
Q: What systems are included in the Tel Aviv Metro Infra II procurement?
A: The package covers GoA4 driverless rolling stock, signalling and train control, electrification, communications, station systems, integration, and operational maintenance. It is valued by NTA at approximately USD 10 billion.
Q: When will NTA announce the winning bidders and commercial service dates?
A: The official delivery schedule and final contract award dates have not been publicly disclosed. Prequalification evaluation precedes the formal invitation to tender for shortlisted international consortia.
Q: How many daily passengers will the Tel Aviv Metro transport once completed?
A: The three-line network is designed to carry over 600 million passenger journeys annually across 109 underground stations. Combined with the local light rail network, regional ridership is projected to exceed 800 million annual journeys.






