VIA Rail Confirms Dorval Transit Hub for 2027 in Montreal
VIA Rail confirmed a 2027 start for the Dorval Multimodal Hub in Montreal with Kiewit, linking intercity rail, exo commuter trains, and airport shuttle buses.

DORVAL, Canada – VIA Rail Canada selected engineering contractor Kiewit Cie in February 2026 to begin the pre-construction co-development phase for the Dorval Multimodal Hub in western Montreal. The project integrates VIA Rail intercity passenger services, exo commuter rail tracks, and dedicated shuttle links to YUL Montréal-Trudeau International Airport. Physical construction at the existing exo transit site is scheduled to begin in 2027 following design finalization.
What Is the Full Scope of This Project?
The Dorval Multimodal Hub consolidates three distinct transit services into a single passenger interchange on the western approach to Montreal. The facility replaces fragmented transfers between the existing exo commuter rail station, the VIA Rail Dorval stop, and municipal bus shuttles accessing YUL Montréal-Trudeau International Airport. Project delivery is structured under a collaborative development agreement between VIA Rail, Kiewit Cie, the Autorité régionale de transport métropolitain (ARTM), and Aéroports de Montréal (ADM). Total capital expenditure has not been publicly disclosed, as the co-development phase is specifically tasked with establishing baseline cost calculations and risk allocations.
Key Project Data
| Parameter | Value |
|---|---|
| Project / Contract Name | Dorval Multimodal Hub (Co-Development Phase) |
| Total Value | Not disclosed (cost estimation pending co-development completion) |
| Parties Involved | VIA Rail Canada, Kiewit Cie, exo, ARTM, STM, Aéroports de Montréal |
| Timeline / Completion | Co-development underway; construction start scheduled for 2027 |
| Country / Corridor | Canada / Quebec City–Windsor Corridor |
How Does This Compare to Similar Projects?
Integrating intercity rail with primary airport terminals reflects a broader North American trend toward intermodal consolidation, yet Dorval’s hub relies on a dedicated surface shuttle rather than direct automated people mover track connections seen at peer facilities. For comparison, Toronto Pearson’s Union Pearson Express provides a direct rail link established for CAD 456 million, whereas Montreal’s hub focuses on station-level consolidation across multiple separate transit authorities (Source: Metrolinx, 2015). This pre-development alliance model mirrors regional procurement approaches aimed at managing infrastructure cost volatility, which has escalated urban rail development expenses across global networks (Source: Market Research Future, 2025). Independent verification of the terminal’s planned passenger throughput capacity was not available at time of publication.
Editor’s Analysis
Dorval resolves an operational disconnect along the Quebec City–Windsor corridor, closing a transfer gap between national passenger routes and Quebec’s primary international airport. By contracting Kiewit Cie under an early involvement framework, VIA Rail seeks to de-risk station construction ahead of wider corridor modernization, aligning with a global passenger rail sector projected to reach US$431.8 billion by 2030 at a 5% annual growth rate (Source: GlobeNewswire, 2025). Long-term success will depend on how effectively regional transport authorities synchronize regional bus and commuter train frequencies with intercity rail schedules.
FAQ
Q: Which transport operators will share the new Dorval Multimodal Hub?
A: The facility will serve VIA Rail intercity passenger trains, exo commuter rail lines, and STM-operated municipal bus connections. Dedicated shuttle services linking travelers directly to YUL Montréal-Trudeau International Airport will also operate out of the unified terminal.
Q: When will construction on the Dorval Multimodal Hub begin and what is the cost?
A: Groundbreaking is scheduled for 2027 following the conclusion of the co-development design phase. Total construction costs are currently undisclosed and will be determined during this collaborative planning period with Kiewit Cie.
Q: How will the project change passenger connections to Montréal-Trudeau International Airport?
A: Passengers will transfer to designated airport shuttles at the centralized exo station site instead of traversing disconnected transit stops. A timeline for potentially replacing road shuttles with fixed-rail airport transit has not been officially confirmed.






